risk in a systems analysis and design project, and how does a project manager cope with risk during the stages of project management?

The major sources of risk in a systems analysis and design project at a strategic level include environmental, external and design risks and over t ime these can accelerate and change the entire nature of a given project plan and direction. These three strategic risks often lead engineering services, project management, organizational and legal risks as well (Fu, Li, Chen, 2012). The strategic elements of customer, technical and delivery risk also serve to further constrain and many times clarify the systems analysis and design foundation of a project (Fu, Li, Chen, 2012). Constraints force trade-offs which in turn lead a project to gain greater clarity of vision and greater acuity of focus on desired results (Fu, Li, Chen, 2012). A project manager will often cope with sources...
[ View Full Essay]