.." (Channel District Redevelopment Area Strategic Action Plan, nd) Because of this increase in demand there must be a facilities upgrade and additions such as new water lines to the water system. The projected water demand for the Channelside District include those listed in the following table labeled Figure 3 in this study.

Channel District Projected Water Demand

Source: Channel District Redevelopment Area Strategic Action Plan, nd

It is stated in the project report that the projected water demand has been reviewed by the City of Tampa Water Department and that these improvements "...are based on the assumption of water availability at the intersection of Channelside Drive and Adamo Drive. It is anticipated that extension of a new transmission main from other City water mains to this location may be required. A water main connecting at that intersection will be outside of the Channel District boundary, and therefore may require...